Blaine Street Elementary School (Monroe, GA)
$ 414k plumbing contract for a new plumbing system for 100,000 sq. ft. replacement school. Includes sanitary waste and vent, domestic water, gas, grease waste and storm drainage. This is a fast track project. See also HVAC project list.
General Contractor: Knoll Construction Co. Completion Date: December 2011
North Georgia Technical College - Hoyt- Coe project (Clarksville, GA)
$120k plumbing contract for the complete renovation of a 23,000 sq. ft. classroom. New systems installed include: sanitary, domestic water, acid waste and onsite gray water recycling system. See also HVAC project list.
General Contractor: RG Williams Construction Completion Date: 3 nd Qtr 2011
Pickens County Community Center (Jasper, GA)
$60k plumbing project for a renovated 30,000 sq. ft. community center to include 2 full size gymnasiums, 4 classrooms, locker rooms and bathrooms. See also HVAC project list
General Contractor : JK Lockwood Construction Completion Date: 3 nd Qtr 2011
Athens Clarke County Parking Deck (Athens, GA)
New construction of a 7 story parking deck with street level retail space and rooftop office space. $210K plumbing project includes installation of 500 gallon cistern for rainwater recycling, drains throughout complex and a 6 th floor gang bath.
General Contractor: Batson-Cook Construction Co. Completion Date: September/October 2011
Athens Technical College (Athens, GA)
Project includes $400K renovation of an existing classroom structure which includes demolition and the installation of a new HVAC system and restructured Plumbing System. This is a fast track project which is performed under time constraint conditions and with short duration. $30K plumbing contract to renovate domestic water and sanitary systems and complete fixture upgrade.
General Contractor: Knoll Construction Completion Date: April 2011
Union County Public Library (Blairsville, GA)
A $40K Renovation of the Plumbing Services in an existing 20,000 Sq. ft. Library Building. This project includes the upgrade of an existing underground sanitary system as well as above ground sanitary and domestic water services.
General Contractor: Winter Construction Completion Date : April 2011
Army Air Force Exchange Service Southeast Distribution Center (Morrow, GA)
A $38k plumbing renovation consisting of a sanitary and domestic water upgrade and new fixtures. Project completed ahead of schedule. See also HVAC project list
General Contractor : DWG & Associates Completion Date: March 2011
Bartow County Jail Expansion (Cartersville, GA)
This project is $2.4M bonded plumbing project which entails a new (8) level Inmate Housing Facility and renovations to the existing facility. The duration of this project is approximately 18 month project from inception to completion.
General Contractor: Peter R. Brown Construction Completion Date: Dec 2010
Studio Movie Grill (Roswell, GA)
Completed this build out of 60k sq ft of a strip mall for dine-in theatre. Poag performed both plumbing and mechanical trades on the project totaling $650k. Plumbing consisted of a complete commercial kitchen and four bathrooms.
General Contractor: Parkway Construction & Associates Completion Date: July 2010
Forsyth National Guard Armory (Forsyth, GA)
Macon-Russell National Guard Armory (North & South Buildings) (Macon, GA)
These jobs totaled $750k for the combined plumbing and HVAC renovation for two locations in three separate buildings. Poag installed new kitchens, set grease traps, completed multiple gang bathrooms, and installed new domestic water & waste, and gas piping within the scope of these jobs. See also HVAC project list.
General Contractor: Randy Early Construction Completion Date: June 2010
Chattahoochee High School (Johns Creek, GA)
This $150k project was a renovation within the existing school and consisted of acid waste, gas, domestic water and waste.
General Contractor: Amacher Brothers Construction Completion Date: April 2010
Morrow Convention Center (Morrow, GA)
This is a renovation project with new bathrooms and commercial kitchen. This is phase one of this design build project. See also HVAC project list.
General Contractor: Batson-Cook Company Completion Date: Nov 2009
Gwinnett Math, Science & Tech High School (Lawrenceville, GA)
This project is a 250k square foot, 5 building, renovation of the existing school and a 5 story new building that connects to the existing two schools. It consists of one floor of science lab rooms, a large commercial kitchen, setting of two 1500 gallon grease traps, test manholes, acid dilution tanks, and all the piping for the roof drains. Included in the plumbing is acid waste, gas, domestic water and waste. This was a 24 month project and the largest Gwinnett County School project to date.
General Contractor: Carroll Daniel Construction Completion Date: Jan 2010
Chattahoochee Technical College (Dallas, GA)
This project is a two story college building including a large science lab area with acid waste, gas, waste and domestic water for all the lab tables and fume hoods.
General Contractor: The Facility Design Group Completion Date: Aug 2009
North Metro Technical College (Acworth, GA)
This project is a two story college building including a large science lab area with acid waste, gas, waste and domestic water for all the lab tables and fume hoods. See also HVAC project list.
General Contractor: The Facility Design Group Completion Date: Aug 2009
Marriott Hotel (Buckhead, GA)
Remodel/ Conversion: Sheraton Hotel to Marriott. Project consists of complete HVAC demolition and renovation work in lobby and common areas and the relocation of the cooling tower. See also HVAC Project List.
General Contractor: Lanco-Nace Completion Date: Oct 2009
Hampton Inn (Lanett, AL)
This project is a 5 story new hotel building that has 111 units. Some specialty fixtures included in some of these units are roll-in showers, Jacuzzi tubs, and bar sinks. This project also has a commercial laundry and a swimming pool. See also HVAC project list.
General Contractor: Batson-Cook Company Completion Date: Mar 2009
Bay Creek Middle School (Grayson, GA)
New Construction: Completed the installation of the plumbing system in this 145,000 sq. ft. school.
General Contractor: Rogers Construction Completion Date: Feb 2009
Couch Middle School (Grayson, GA)
New Construction: Completed the installation of the plumbing system in this 145,000 sq. ft. school.
General Contractor: Rogers Construction Completion Date: Feb 2009
Emerson Overlook (Marietta, GA)
New Construction: Completed installation of a new plumbing system in this 7 story retail and residential condominium.
General Contractor: de Oplossing Completion Date: Nov 2008
Stork Gamco (Gainesville, GA)
This project was an addition to an existing equipment plant. This project included the basic plumbing system. There was a major compressed air system installed including a compressor, dryer, filter, and 350 gallon holding tank. From this 700 ft. of 3” Victaulic air lines with drops were run. The sewer system went through a dual pump injector system, and the entire bay area trench and floor drains went through a 1500 gal. oil and sand separator. Also included was a high pressure commercial power washer unit.
General Contractor: The Facility Group Completion Date: Nov 2008
The Strand Theatre (Marietta, GA)
Complete demolition and plumbing renovation in this historic theatre. All the plumbing was newly installed and included one small commercial kitchenette on each floor with a concession stand.
General Contractor: de Oplossing Completion Date: Oct 2008
North Georgia College (Dahlonega, GA)
Completed the new plumbing system in this historical 3 story building. Overall contract value $500k. See also HVAC Project List.
General Contractor: Swofford Construction Completion Date: Sep 2008
TipTop Chicken Processing Plant (Rockmart, GA)
This is an expanding chicken production plant. We have done two major projects there with the remodel of their cooler rooms where we added all the floor drains needed. We installed stainless steel plumbing for air, hot and cold water, and high pressure water in their production line including related drains. In the main plant we installed floor drains, wall hung steam heaters, and emergency eye wash and shower units.
Direct-to-Owner Completion Date: Jul 2008
Cobb County Fire Station #5 (Atlanta, GA)
Completed the plumbing on this new construction (2 bay) fire station in Cobb County.
General Contractor: Batson-Cook Completion Date: Jul 2008
Homestead Air Force Base (Homestead, FL)
Installed a new plumbing system. Overall contract value $180k. See also HVAC Project List.
General Contractor: Meco Builders Completion Date: Jan 2008
Orthopaedic South Surgery Clinic
KR Witwer
Feb 2008
Overall contract value $230k. Installed a new plumbing system.

Downtown Marriott – Memphis, TN
Digney York
Nov 2007
Poag Mechanical replaced all of the plumbing fixtures in 250 guestrooms.
Gilmer County Library (Ellijay, Ga)
Headley Construction
Sep 2007
Poag Mechanical installed a new plumbing system in this building. See also HVAC project list.
Mill Springs Academy (Milton, Ga)
Osbourne and Assoc.
Sep 2007
Plumbing: Installed a new plumbing system.
Rabun County Hosp (Rabun Cty Ga)
Lusk and Associates
Aug 2007
Installed a new plumbing system in the existing hospital.

Comfort Inn (Blue Ridge, Ga)
Paris Construction
Aug 2007
Installed a new plumbing system in this 3 story Hotel.

Comfort Inn (Buford, Ga)
Paris Construction
July 2007
Installed a new plumbing system in this 3 story Hotel.
West Fannin Elementary (Blue Ridge, Ga)
Meco Builders
June 2007
Poag Mechanical installed the plumbing/utility system in this school addition.

Hyatt Tech Center – Denver, CO.
Digney York
June 2007
Poag Mechanical replaced all of the plumbing fixtures in 300 guestrooms.
Wellstar-Kennestone Clinic (Kennesaw, Ga)
Martin Gen’l Contracting
June 2007
Overall contract value $70k. Installation of a new plumbing system. See also HVAC project list.

Atlanta Airport Marriott
Graycor
Apr 2007
Overall contract value $1.9m. Poag Mechanical replaced the plumbing fixtures in over 600 restrooms and completed all necessary ADA upgrades. See also HVAC project list.

Hyatt Ivy Tower - Atlanta
Nix Unger
Feb 2007
Overall contract value $800k. Poag Mechanical replaced the plumbing fixtures in 200 restrooms, replaced all of the domestic water piping, and installed new isolation valves at each restroom. See also HVAC project list.
Pickens County Administrative Office
Nicorp Development
Feb 2007
Plumbing: Installed a new plumbing system in the old hospital
Athena Urology (Athens, Ga)
Burrson Construction
Jan 2007
Overall contract value $180k. Poag Mechanical installed a new plumbing system in this building. See also HVAC project list.
Piedmont Mountainside Clinic (Jasper, Ga)
Warren Hanks
Oct 2006
Poag Mechanical installed a new plumbing system. See also Medical Gas project list.
Dr. Tom and Susan Reilly Dental (Norcross, Ga)
Tech Services
Sep 2006
Overall contract value $32k. Installed a new plumbing system complete with medical plumbing that included 3 dental chairs, model trimmer, plaster trap, water filtration manifold, dental sinks, sterilization sink, and distillation tank. See also Medical Gas project list.
Sawnee EMC (Cummings, GA)
Ricks Contractors
Aug 2006
New Construction. Installed a new plumbing system in the new warehouse building and engineering building.
Oaks Assisted Living (Canton, Ga)
N & A Construction
Jul 2006
Plumbing: Installed a new plumbing system for a 93 bed facility.
Gwinnett County Public Safety Complex
Group VI
July 2006
New construction. Installed a new plumbing system inside the fire station and police precinct.

Appalachian Tech (Jasper, GA)
RW Allen
Jul 2006
Plumbing: Installed a new plumbing system in the new front addition and body shop.

Marriott Marquis – Atlanta
Graycor
April 2006
Poag Mechanical was the plumbing contractor on this project, the scope of work included the following: Forty-seven stories, 48 ADA restroom modifications, 127 suite modifications, and 1640 guestroom modifications, new tub and shower valves, new lavatories, new water closets, new bar sinks, new showers in ADA rooms.
Dr Golden Dental Office (Cumming, Ga)
Tech Services
Apr 2006
Overall contract value $22k. Installed a new plumbing system complete with medical plumbing that included 6 dental chairs, model trimmer, plaster trap, water filtration manifold, dental sinks, sterilization sink, and distillation tank. See also Medical Gas project list.
North Ga. MOB (Jasper, Ga)
Group VI
Feb 2004
Installed a new plumbing system in this 40,000 sq. ft. facility. Included multiple exam sinks, medical equipment, and numerous medical fixtures.
Gwinnett Dental (Gwinnett Cty, Ga)
Ahmir Shaazod
June 2002
Overall contract value $25k. Installed a new plumbing system complete with medical plumbing that included 6 dental chairs, model trimmer, plaster trap, water filtration manifold, dental sinks, sterilization sink, and distillation tank. See also Medical Gas project list.
Eric Pryor Dental Office (Jasper, Ga)
Price Davis
Apr 2002
Overall project value $36k. Installed a new plumbing system that included 6 dental chairs, model trimmer, plaster trap, water filtration manifold, dental sinks, sterilization sink, and distillation tank. |